{"id":7123,"date":"2026-11-18T01:38:08","date_gmt":"2026-11-17T22:38:08","guid":{"rendered":"https:\/\/studiokook.ee\/?p=7123"},"modified":"2026-11-18T01:38:08","modified_gmt":"2026-11-17T22:38:08","slug":"koogi-valmistamise-aeg","status":"publish","type":"post","link":"https:\/\/studiokook.ee\/en\/koogi-valmistamise-aeg\/","title":{"rendered":"How long it takes to make a custom-made kitchen and what the lead time is counted from"},"content":{"rendered":"<div class=\"wp-block-group sk-article-body\"><div class=\"wp-block-group__inner-container is-layout-flow wp-block-group-is-layout-flow\">\n<p class=\"sk-lead wp-block-paragraph\">Making a custom-made kitchen at Studiok\u00f6\u00f6k usually takes 5\u20137 weeks. In months when production is especially busy, the lead time may increase to 12 weeks. The exact duration is agreed with the client and recorded in the contract.<\/p>\n\n\n\n<p class=\"sk-lead wp-block-paragraph\">The lead time is counted from the moment the client confirms the working design. Before that come measuring the room and preparing the working design. So when planning a renovation, it is important to take into account not only production times but also the readiness of the room and the choice of materials and household appliances.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"osa-1\">Lead time and when it starts<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Studiok\u00f6\u00f6k makes each kitchen to an individual design. The size of the cabinets, their construction and interior fittings depend on the features of the room and the customer's wishes.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The lead time is counted not from the first enquiry or from placing the order, but from the moment the client confirms the working design.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is usually 5\u20137 weeks, but when production is busy it can reach 12 weeks. These are approximate times, not a universal guarantee for every order. The specific lead time is stated in the contract.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The furniture is made to the working design, which already takes into account the final dimensions of the room, the appliance models and the chosen specification.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is why agreeing the design in good time matters a great deal. If the necessary decisions are delayed or the room is not yet ready for measuring, this may affect the originally planned installation date of the kitchen.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"osa-2\">What happens before production starts<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The work begins with a preliminary quote. A ready interior design project is not needed for the first enquiry: it is enough to send the dimensions of the room or a simple hand-drawn sketch and say what kind of kitchen you would like to order.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We usually reply to enquiries within 24 hours. Based on the information received, we prepare a quote and a 3D sketch showing the arrangement of furniture and household appliances. We also prepare the sketch within 24 hours.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It lets you assess the future layout and discuss in advance the placement of cabinets, appliances and the main work zones. At this stage different solutions can be considered and the most suitable option chosen.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Once the quote has been agreed, the order is placed. Next comes the technical preparation of the furniture for production.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The next stage is measuring the room. It is carried out after the order is placed and is included in the cost of the kitchen. The specialist's visit itself takes 30\u201360 minutes.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" width=\"2560\" height=\"1708\" src=\"https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL3309-scaled.jpg\" alt=\"Full kitchen run with handleless matt dark base cabinets, marble-look countertop and splashback, and wood-veneer wall cabinets\" class=\"wp-image-6704\" srcset=\"https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL3309-scaled.jpg 2560w, https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL3309-300x200.jpg 300w, https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL3309-1024x683.jpg 1024w, https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL3309-768x512.jpg 768w, https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL3309-1536x1025.jpg 1536w, https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL3309-2048x1366.jpg 2048w, https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL3309-18x12.jpg 18w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><figcaption class=\"wp-element-caption\">The wall cabinets follow the line of the sloping ceiling.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">By then the room must have its final dimensions. For orders in Finland, the client takes the measurements themselves.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We have described the preparation of the room and the specialist's work in more detail in separate articles on renovation and measuring a kitchen.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/studiokook.ee\/en\/koogi-moodistamine\/\">Measuring a kitchen: what the specialist checks and how to prepare the room<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A working design is drawn up on the basis of the measurements received. It specifies the construction of the cabinets, the placement of household appliances, interior fittings and hardware. The kitchen is shown in the agreed colours and materials.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For the working design it is already necessary to know the specific models of household appliances. Their installation dimensions and installation requirements affect the construction of individual modules.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">When all the details have been agreed and the client confirms the design, the furniture goes into production \u2014 and this is the moment the lead time is counted from.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"osa-3\">What can delay an order<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">In our experience, the longest stages of preparation are often agreeing the preliminary sketch and the price, and waiting for the room to be ready for measuring.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For example, after receiving the first quote, the client may want to change the layout, choose different fronts or reconsider the interior fittings of the cabinets. It is better to discuss such decisions before the design is finally agreed, because they may affect the construction of the furniture.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Another common situation is related to renovation. If the walls are still being levelled or work that will change the dimensions of the room is still under way, it is too early to measure. As a result, preparation of the working design is postponed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/studiokook.ee\/en\/remont-ja-eritellimusel-kook\/\">Renovation and a custom-made kitchen: when to start designing and invite the measurer<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sometimes extra work arises because of where the services are positioned. The electrical sockets, water supply and drainage may be put in before the kitchen layout has been agreed. When the exact position of the appliances becomes known, it turns out that some connections need to be moved.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We have examined this topic in detail in the article \u201cSockets, water and drainage in the kitchen: how to position the connection points correctly\u201d.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/studiokook.ee\/en\/koogitehnika-uhendused\/\">Sockets, water and drainage in the kitchen: how to position the connection points correctly<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Such circumstances do not necessarily lengthen the time it takes to make the furniture itself, but they may delay its going into production and affect the installation date.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is why, already when placing the order, it is important to consider how ready the room is for the next stages and which decisions still have to be agreed.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"osa-4\">Changes after the design is confirmed<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The working design determines the construction of the furniture and serves as the basis for making it. So before confirming it, it is worth carefully checking the cabinet dimensions, the position of the appliances, the materials, colours and interior fittings.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, sometimes the need for changes arises already after the design has been agreed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">At Studiok\u00f6\u00f6k, changes can still be made until the furniture parts have been cut. The cost and lead time are then recalculated to take the new decisions into account.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For example, changing the width of a cabinet may affect the dimensions of several parts, and choosing different interior fittings may require additional components.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is therefore better to settle the main questions before the working design is confirmed, especially if an agreed kitchen installation date matters to you.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"osa-5\">Ordering a kitchen in advance<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The order can be placed long before the renovation is finished. You do not necessarily have to wait until the walls are painted, the flooring is laid and all the finishing works are complete.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">With an early order the lead time is counted in the same way \u2014 from the confirmation of the working design, which is prepared after measuring; this is agreed when the order is placed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is therefore advisable to agree the schedule for the renovation and the making of the furniture in advance. You need to know when the room will be ready for measuring, when the design can be completed and at what point installation of the kitchen will become possible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Studiok\u00f6\u00f6k does not offer a storage service for finished furniture. Installation is planned according to how ready the room is, so its preparation must keep to the agreed schedule.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"2560\" height=\"1708\" src=\"https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL0265-scaled.jpg\" alt=\"Corner kitchen seen straight on, from the sink to the oven: tall cabinet on the left, LED lighting along the wood splashback\" class=\"wp-image-6828\" srcset=\"https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL0265-scaled.jpg 2560w, https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL0265-300x200.jpg 300w, https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL0265-1024x683.jpg 1024w, https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL0265-768x512.jpg 768w, https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL0265-1536x1025.jpg 1536w, https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL0265-2048x1366.jpg 2048w, https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL0265-18x12.jpg 18w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><figcaption class=\"wp-element-caption\">Installed corner kitchen: tall cabinet on the left, lighting under the wall cabinets.<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">If the renovation is still under way, it is important to take the remaining work and possible delays into account when placing the order. This helps avoid a situation where the furniture is already finished but cannot yet be installed.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"osa-6\">Where to start<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">If you are planning a new kitchen, send us the dimensions of the room or a simple hand-drawn sketch. A ready interior design project is not required for a preliminary quote.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">We usually reply to enquiries within 24 hours. This makes it possible to discuss the future kitchen in advance and to align the next stages with your renovation plan.<\/p>\n<\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Studiok\u00f6\u00f6k valmistab eritellimusel k\u00f6\u00f6gi tavaliselt 5\u20137 n\u00e4dalaga. Kuudel, mil tootmine on eriti koormatud, v\u00f5ib t\u00e4htaeg pikeneda kuni 12 n\u00e4dalani. T\u00e4pne valmistamise t\u00e4htaeg lepitakse kliendiga kokku ja fikseeritakse lepingus. T\u00e4htaega hakatakse lugema hetkest, kui klient on t\u00f6\u00f6projekti kinnitanud. Enne seda toimuvad ruumi m\u00f5\u00f5distamine ja t\u00f6\u00f6projekti koostamine. Seet\u00f5ttu tuleb remondi planeerimisel arvestada mitte ainult tootmise t\u00e4htaegadega, vaid [&hellip;]<\/p>","protected":false},"author":1,"featured_media":6770,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_yoast_wpseo_focuskw":"","_yoast_wpseo_title":"Kui kaua eritellimusel k\u00f6\u00f6ki valmistatakse \u2013 Studiok\u00f6\u00f6k","_yoast_wpseo_metadesc":"Studiok\u00f6\u00f6k valmistab eritellimusel k\u00f6\u00f6gi tavaliselt 5\u20137 n\u00e4dalaga, suure koormuse korral kuni 12 n\u00e4dalaga. T\u00e4htaega loetakse t\u00f6\u00f6projekti kinnitamisest.","ngg_post_thumbnail":0,"footnotes":""},"categories":[5],"tags":[],"class_list":["post-7123","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blogi"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.3 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Kui kaua eritellimusel k\u00f6\u00f6ki valmistatakse \u2013 Studiok\u00f6\u00f6k<\/title>\n<meta name=\"description\" content=\"Studiok\u00f6\u00f6k valmistab eritellimusel k\u00f6\u00f6gi tavaliselt 5\u20137 n\u00e4dalaga, suure koormuse korral kuni 12 n\u00e4dalaga. T\u00e4htaega loetakse t\u00f6\u00f6projekti kinnitamisest.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/studiokook.ee\/en\/koogi-valmistamise-aeg\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kui kaua eritellimusel k\u00f6\u00f6ki valmistatakse \u2013 Studiok\u00f6\u00f6k\" \/>\n<meta property=\"og:description\" content=\"Studiok\u00f6\u00f6k valmistab eritellimusel k\u00f6\u00f6gi tavaliselt 5\u20137 n\u00e4dalaga, suure koormuse korral kuni 12 n\u00e4dalaga. T\u00e4htaega loetakse t\u00f6\u00f6projekti kinnitamisest.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/studiokook.ee\/en\/koogi-valmistamise-aeg\/\" \/>\n<meta property=\"og:site_name\" content=\"Studiok&ouml;&ouml;k\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-17T22:38:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL4495-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1708\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/\",\"url\":\"https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/\",\"name\":\"Kui kaua eritellimusel k\u00f6\u00f6ki valmistatakse \u2013 Studiok\u00f6\u00f6k\",\"isPartOf\":{\"@id\":\"https:\/\/studiokook.ee\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL4495-scaled.jpg\",\"datePublished\":\"2026-11-17T22:38:08+00:00\",\"author\":{\"@id\":\"https:\/\/studiokook.ee\/#\/schema\/person\/49449b9a808ac9928fddbe584e7bb341\"},\"description\":\"Custom kitchen furniture in Tallinn. Bespoke kitchens with individual measurements and designs. Austrian hardware, 2-year warranty.\",\"breadcrumb\":{\"@id\":\"https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/#primaryimage\",\"url\":\"https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL4495-scaled.jpg\",\"contentUrl\":\"https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL4495-scaled.jpg\",\"width\":2560,\"height\":1708,\"caption\":\"Kogu k\u00f6\u00f6gi planeering s\u00f6\u00f6gitoa poolt: keskel k\u00f6\u00f6gisaar, vasakul bee\u017eid \u00fclemised kapid, paremal tammest k\u00f5rged kapid\"},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/studiokook.ee\/#website\",\"url\":\"https:\/\/studiokook.ee\/\",\"name\":\"Studiok&ouml;&ouml;k\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/studiokook.ee\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/studiokook.ee\/#\/schema\/person\/49449b9a808ac9928fddbe584e7bb341\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/studiokook.ee\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8addc423e902010616722e6bc21a7fa25d0a9e06a65a67472907be74916f576b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8addc423e902010616722e6bc21a7fa25d0a9e06a65a67472907be74916f576b?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\/\/studiokook.ee\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Kui kaua eritellimusel k\u00f6\u00f6ki valmistatakse \u2013 Studiok\u00f6\u00f6k","description":"Studiok\u00f6\u00f6k valmistab eritellimusel k\u00f6\u00f6gi tavaliselt 5\u20137 n\u00e4dalaga, suure koormuse korral kuni 12 n\u00e4dalaga. T\u00e4htaega loetakse t\u00f6\u00f6projekti kinnitamisest.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/studiokook.ee\/en\/koogi-valmistamise-aeg\/","og_locale":"en_GB","og_type":"article","og_title":"Kui kaua eritellimusel k\u00f6\u00f6ki valmistatakse \u2013 Studiok\u00f6\u00f6k","og_description":"Studiok\u00f6\u00f6k valmistab eritellimusel k\u00f6\u00f6gi tavaliselt 5\u20137 n\u00e4dalaga, suure koormuse korral kuni 12 n\u00e4dalaga. T\u00e4htaega loetakse t\u00f6\u00f6projekti kinnitamisest.","og_url":"https:\/\/studiokook.ee\/en\/koogi-valmistamise-aeg\/","og_site_name":"Studiok&ouml;&ouml;k","article_published_time":"2026-11-17T22:38:08+00:00","og_image":[{"width":2560,"height":1708,"url":"https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL4495-scaled.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Estimated reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/","url":"https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/","name":"Kui kaua eritellimusel k\u00f6\u00f6ki valmistatakse \u2013 Studiok\u00f6\u00f6k","isPartOf":{"@id":"https:\/\/studiokook.ee\/#website"},"primaryImageOfPage":{"@id":"https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/#primaryimage"},"image":{"@id":"https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/#primaryimage"},"thumbnailUrl":"https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL4495-scaled.jpg","datePublished":"2026-11-17T22:38:08+00:00","author":{"@id":"https:\/\/studiokook.ee\/#\/schema\/person\/49449b9a808ac9928fddbe584e7bb341"},"description":"Custom kitchen furniture in Tallinn. Bespoke kitchens with individual measurements and designs. Austrian hardware, 2-year warranty.","breadcrumb":{"@id":"https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/"]}]},{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/studiokook.ee\/koogi-valmistamise-aeg\/#primaryimage","url":"https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL4495-scaled.jpg","contentUrl":"https:\/\/studiokook.ee\/wp-content\/uploads\/2026\/09\/IKL4495-scaled.jpg","width":2560,"height":1708,"caption":"Kogu k\u00f6\u00f6gi planeering s\u00f6\u00f6gitoa poolt: keskel k\u00f6\u00f6gisaar, vasakul bee\u017eid \u00fclemised kapid, paremal tammest k\u00f5rged kapid"},{"@type":"WebSite","@id":"https:\/\/studiokook.ee\/#website","url":"https:\/\/studiokook.ee\/","name":"Studiok&ouml;&ouml;k","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/studiokook.ee\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/studiokook.ee\/#\/schema\/person\/49449b9a808ac9928fddbe584e7bb341","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/studiokook.ee\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/8addc423e902010616722e6bc21a7fa25d0a9e06a65a67472907be74916f576b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8addc423e902010616722e6bc21a7fa25d0a9e06a65a67472907be74916f576b?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/studiokook.ee"]}]}},"_links":{"self":[{"href":"https:\/\/studiokook.ee\/en\/wp-json\/wp\/v2\/posts\/7123","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/studiokook.ee\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/studiokook.ee\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/studiokook.ee\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/studiokook.ee\/en\/wp-json\/wp\/v2\/comments?post=7123"}],"version-history":[{"count":1,"href":"https:\/\/studiokook.ee\/en\/wp-json\/wp\/v2\/posts\/7123\/revisions"}],"predecessor-version":[{"id":7124,"href":"https:\/\/studiokook.ee\/en\/wp-json\/wp\/v2\/posts\/7123\/revisions\/7124"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/studiokook.ee\/en\/wp-json\/wp\/v2\/media\/6770"}],"wp:attachment":[{"href":"https:\/\/studiokook.ee\/en\/wp-json\/wp\/v2\/media?parent=7123"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/studiokook.ee\/en\/wp-json\/wp\/v2\/categories?post=7123"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/studiokook.ee\/en\/wp-json\/wp\/v2\/tags?post=7123"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}